The Lightweight pressurised inversion unit ensures quick and efficient setting up at inversion manholes.
Compact design allows C.I.P.P. to be installed in confined or difficult locations.
Additionally when setting up in busy roads the size of any inversion site can be kept to a minimum.

    

For larger diameter linings a scaffold is erected over the inversion manhole.
The height of this tower is set to allow a predetermined head of water to invert the liner.
To maintain the existing flow in the pipe being renovated, a temporary overpumping bypass can be provided.